Overview:
Blue Science Engineering successfully implemented a 1.2MW hybrid solar and battery energy system for a leading manufacturing plant in Dhaka. The system ensures consistent power supply, integrates grid synchronization, and reduces dependency on fossil fuels by 65%.
Key Deliverables:
Solar panel installation (rooftop + ground-mounted)
Intelligent inverter and battery storage integration